[BUG] - SET auto-reassigned before component reaches max R&D

Moderators: Nacho84, N_Molson

Post Reply
Sabratha
SPM Contributor
SPM Contributor
Posts: 536
Joined: Thu Jan 05, 2012 2:39 am

[BUG] - SET auto-reassigned before component reaches max R&D

Post by Sabratha »

SET personnel get reassigned after a false "component reaches max R&D" message.

Issue occurs in situations where the component normally would reach max R&D this turn, but becomes downgraded as a result of a mission failure.

It seems as if the AI checks for the R&D max reliability before all missions are resolved. Perhaps it should be tweaked so that reassigning SET personnel is the very last thing in a turn, already after missions get resolved.

Steps:
1) Load the attached savegame
2) End turn
3) Launch the scheduled explorer mission, see it fail.
4) At the end season screen, take note of the notice about SET people being reassigned.
5) Go to the Explorer program and check the R&D levels.
Attachments
saveANDdxdiag.zip
(15.18 KiB) Downloaded 202 times
N_Molson
SPM Contributor
SPM Contributor
Posts: 233
Joined: Tue Oct 29, 2013 2:55 pm
Location: Les Essarts, France

Re: [BUG] - SET auto-reassigned before component reaches max

Post by N_Molson »

Ah, I noticed this one too, but wasn't sure if I should report it as a bug. Well, let's go and do it. Will report.
Nicolas Escats
Buzz Aldrin's Space Program Manager Contributor
Nacho84
SPM Moderator
SPM Moderator
Posts: 1382
Joined: Thu Feb 07, 2013 6:32 pm
Location: Brighton, UK

Re: [BUG] - SET auto-reassigned before component reaches max

Post by Nacho84 »

Thanks for the savefile! It's fixed now, the solution will be included in SPM 0.7.14 next Friday.

Cheers,
Ignacio Liverotti
Lead Developer of Buzz Aldrin's Space Program Manager

Polar Motion
Twitter
Post Reply

Return to “Buzz Aldrin's Space Program Manager : Early Access Beta Forum”