GSv2.00.06 (GSv2.00 Pre Release Hotfix 06).
Posted: Fri Apr 22, 2011 9:18 pm
I. PC users can download the prerelease hotfix 06 from google documents or rapidshare. Again, the download from rapidshare is free. Don't be confused into thinking you have to buy a subscription to download.
II. MAC users will need to get this hotfox from Paul.
III. GSv2.00.06 (Hotfix 06) (April 22, 2011)
1. Updated the code so it now generates initial severe winter for the 1940 and 1941 scenarios.
2. Changes to para build time from 2 to 5 and increase the yearly build limit to:
a. 1939 (0)
b. 1940 (2 from 1)
c. 1941 (2 from 1)
d. 1942 (2 from 1)
e. 1943 (2 from 1)
f. 1944 (3 from 2)
g. 1945 (3 from 2)
3. Changed to severe weather winter chances to:
a. Severe winter chance for October: 0 % (was 10%)
b. Severe winter chance for November: 25% (was 33%)
c. Severe winter chance for December: 75% (was 66%)
d. Severe winter chance for January: 100% (as before)
4. Changed the North / eastern weather probabilities
a. October: 25% mud, 25% winter, 50% fair (was 15% mud, 10% winter, 75% fair)
b. November: 50% mud, 50% winter 0% fair (was 50% mud, 25% winter, 25% fair)
c. April: 50% mud, 35% winter, 15% fair (was 50% mud, 25% winter, 25% fair)
II. MAC users will need to get this hotfox from Paul.
III. GSv2.00.06 (Hotfix 06) (April 22, 2011)
1. Updated the code so it now generates initial severe winter for the 1940 and 1941 scenarios.
2. Changes to para build time from 2 to 5 and increase the yearly build limit to:
a. 1939 (0)
b. 1940 (2 from 1)
c. 1941 (2 from 1)
d. 1942 (2 from 1)
e. 1943 (2 from 1)
f. 1944 (3 from 2)
g. 1945 (3 from 2)
3. Changed to severe weather winter chances to:
a. Severe winter chance for October: 0 % (was 10%)
b. Severe winter chance for November: 25% (was 33%)
c. Severe winter chance for December: 75% (was 66%)
d. Severe winter chance for January: 100% (as before)
4. Changed the North / eastern weather probabilities
a. October: 25% mud, 25% winter, 50% fair (was 15% mud, 10% winter, 75% fair)
b. November: 50% mud, 50% winter 0% fair (was 50% mud, 25% winter, 25% fair)
c. April: 50% mud, 35% winter, 15% fair (was 50% mud, 25% winter, 25% fair)